TEPLA Gigabatch 380P (ASH961-03)
The system was installed in July 2021, switched to warm steel mode in July 2024, and to cold steel mode in January 2025. It was therefore in operation for only 3 years and is consequently in very good condition. However, only one preventive maintenance (PM) has been performed since installation, so it is possible that some of the O-rings are worn.